Just a quick post to say I am still here and am still working on projects. Currently I am knitting on two pair of socks (one for an auction I offered a pair in), working on a cloak for a peerage elevation, a silk banner (slow going cause the silk is being difficult) and am plotting many other projects as well. Another blackwork coif, goblet cover, embroidered bag in german brick stitch, etc.
End of school year and work has me crazy and exhausted that a lot of times i fall asleep on the sofa at 8pm. Don't worry..ill post pics soon. thanks for sticking around.
Tuesday, June 5, 2018
Subscribe to:
Post Comments (Atom)
Hi! I have moved my blog to wordpress. After a short I will be shutting this one down. Here is the link to the new site where i backed up...
-
So my friend Sue came over last night on crafty night and taught me how to do a version of needle lace called teneriffe lace. It was quite ...
-
Materials Used: 100% linen fabric 4 yards washed and dried Cottom DMC Embroidery thread Coats and Clark sewing thread Made this tunic ...
-
It was a busy couple of months. I was working on two projects simultaneously. The german brickwork pouch (previous entry) and this tunic fo...
No comments:
Post a Comment